频道
Home   About Us | Contacts | Services | Media Desk | Tenders | Vacancies
Site Map
个人工具
您位于: 首页 Media Desk Media Statements 2018 M1/Grayston Drive bridge collapse inquiry completes its work and now awaits for submission of written closing arguments
导航
     Department of Labour Fraud line-08600 22 194   Southern African Development Community  BRICS Business Council
 
文档操作

乐天堂娱乐城:M1/Grayston Drive bridge collapse inquiry completes its work and now awaits for submission of written closing arguments

作者:Lloyd Ramutloa 上次修改时间: 2018-07-13 11:25

乐天堂娱乐城代理开户 www.4dwfy.com.cn 13 July 2018

The Grayston Drive Pedestrian and cyclist structural bridge collapse inquiry set-up by the Department of Labour completed its work of gathering evidence on the collapse of temporary work structure this week, and was now awaiting the submission of written heads of arguments by legal representatives of interested stakeholders by 14 August 2018.

This will be followed by written responses to the heads of argument which are expected to be submitted by 17 September 2018.

The Section 32 hearing was set up by the Department of Labour to investigate the 14 October 2015 incident which happened at approximately 15:25 and led to the death of two people; injury to 19 persons.

The inquiry which resumed on July 2 following a nine month lull completed its work ahead of scheduled target. When it resumed on July 2 the Commission had set 27 September 2018 as the target date to complete its work.

Stakeholders in the inquiry include: the Johannesburg Municipality as the Client; Johannesburg Development Agency (JDA) as the Agent; Royal Haskoning DHV an Engineering company appointed by JDA as the engineering agent for the project; Murray & Roberts (MR) - as the Principal Contractor appointed by JDA; Form-Scaff - as the contractor appointed by (MR); the people/person injured in the incident; the Engineering Council of South Africa; and National Union of Mineworkers (NUM) representing the employees of Murray & Roberts; attorneys representing the Doodnath family who were injured in the incident and the late Mr Doodnath.

The Grayston Inquiry had its first sitting in February 2016.

Witnesses that have previously appeared before the inquiry include: Professor Roelf J. Mostert an expert witness representing Murray and Roberts; Richard Beneke, an expert witness representing Murray and Roberts; Ric Snowden, an expert witness representing Murray and Roberts; Dr. Stefanus Francois van Zyl, an expert witness representing Murray and Roberts; Garry Farrow, an Australian-based engineer testifying on behalf of Form-Scaff; Dr Andrew Potts, a professional engineer based in Australia testifying on behalf of Form Scaff.

Following the latest session some of the witnesses that appeared before the inquiry included Roxana Le Roux, an environmental, health and safety officer from Nemai Consulting; Oliver Aadnesgaard, an employee of Murray & Roberts who worked as an assistant to construction manager during the collapse of the temporary works structure; Hein Pretorius, an engineer during the construction; and Dr Roger Barker.

-ENDS-

Issued by:

Teboho Thejane 

Departmental Spokesperson 

082 697 0694

 

 


Copyright ©2018 The South African Department of Labour:
Home | Disclaimer | PAIA | 乐天堂娱乐城代理开户Webmaster
  • 15日起办理临时身份证全济南通办立等可取 已有市民尝鲜 ——凤凰网房产济南 2019-02-19
  • 2016消费电子高峰论坛 2019-02-19
  • 中国作家协会2018年会员发展公示 2019-02-19
  • 应该透过现象看本质,看到产生腐败的根源,产生腐败的根源在于社会财富被个人占为私有的私有制,只要存在私有制,就有私有特权,掌握公权力的人一旦把公权力当作... 2019-02-19
  • 地铁3号线保税区站黑车多 运管部门开展整治行动 2019-02-18
  • 40载情定广彩 终练就“国大师” 2019-02-18
  • “龙江二号”微卫星传回地月合影 2019-02-18
  • 六月让荣湖 杜鹃花正艳 2019-02-17
  • 多地明确海洋经济发展路线图 2019-02-17
  • “便利店+”时代正在来临 2019-02-16
  • 食品中农药残留 限量标准问答 2019-02-16
  • 彭湃:“农民运动大王”(为了民族复兴·英雄烈士谱) 2019-02-16
  • 钱江晚报:火锅店被吃垮,实际是信任破产 2019-02-16
  • 西安回应“抢人大战致房价上涨”:恶意营销 2019-02-15
  • 红木家具日常养护之法 2019-02-15
  • 531| 302| 491| 865| 775| 220| 431| 653| 558| 38|